Current Infraprojects Limited Secures Rs 10.42 Cr Order from Bank Note Press, Dewas for 3 MW Rooftop Solar Project

Jaipur (Rajasthan) [India], September 19: Current Infraprojects Limited (NSE: CURRENT), one of the leading solar power infrastructure companies, is pleased to announce that the company has received a Notification of Award from Bank Note Press (BNP), Dewas, for a 3 MW Grid-Connected Rooftop Solar Project valued at ₹10.42 Cr, with completion scheduled within 240 days.

Key Highlights Of The Order:

  • Awarded by: Bank Note Press (BNP), Dewas, Madhya Pradesh
  • Scope of work: Development of 3 MW Grid Connected Roof Top Solar Power Project in Behind the Meter Mode at BNP Dewas, with 5 Year Operation & Maintenance
  • Contract value: ₹10.42 Cr
  • Start date: September 16, 2026
  • Completion period: 240 days from the date of Notification of Award

Growth Significance:

This order from Bank Note Press, Dewas, strengthens Current Infraprojects Limited’s presence in the government and institutional rooftop solar segment. The 3 MW Grid-Connected Rooftop Solar Project, coupled with a 5-year Operation & Maintenance contract, demonstrates the Company’s end-to-end capabilities across project development, execution and long-term maintenance. The order also adds to the Company’s ongoing solar EPC momentum and strengthens its engagement with institutional clients.

Located in Madhya Pradesh (M.P.), the project further expands Current Infraprojects Limited’s PAN-India execution footprint, reducing geographic concentration and supporting its strategy of expanding into new markets. The order also strengthens the Company’s order book and revenue visibility, while providing an opportunity to build a stronger presence in the government-led renewable energy infrastructure segment.

Commenting on the order win Mr. Sunil Singh Gangwar, Chairman and Managing Director, Current Infraprojects Limited said, “We are delighted to have received this Notification of Award from Bank Note Press, Dewas for the development of a 3 MW Grid-Connected Rooftop Solar Power Project. This order is a strong reflection of the trust that government institutions continue to place in our capabilities and execution track record. The project involves not just the development of the solar power system but also a 5-year Operation & Maintenance contract, which further strengthens our long-term revenue visibility. Located in Madhya Pradesh, this project also further diversifies our PAN-India presence. We are committed to executing this project within the stipulated timeline of 240 days while maintaining the highest standards of quality and reliability. We remain focused on expanding our presence in the government and institutional rooftop solar segment and delivering consistent long-term value to all our stakeholders.”

About Current Infraprojects Limited

Current Infraprojects Limited (CIPL) is a multidisciplinary EPC company offering solutions across power distribution, railway electrification, utility shifting, water infrastructure, and renewable energy. With a growing presence across multiple states, the Company has evolved from a Rajasthan-focused electrical contractor into a diversified EPC platform.

With strong execution capabilities, 45+ certified engineers, centralized procurement, ERP-based project monitoring, and an in-house NABL-accredited MEC Test House, CIPL focuses on short-duration, execution-intensive projects while maintaining quality and cost control. Its growing Solar EPC and RESCO portfolio, including commissioned plants with long-term PPAs, further strengthens its capabilities in delivering integrated renewable energy solutions.

For FY26, the company has reported Total Income of ₹161.35 Cr, EBITDA of ₹23.23 Cr and Net Profit of ₹14.05 Cr.

Disclaimer

Certain statements in this document that are not historical facts are forward looking statements. Such forward-looking statements are subject to certain risks and uncertainties like government actions, local, political or economic developments, technological risks, and many other factors that could cause actual results to differ materially from those contemplated by the relevant forward-looking statements. The Company will not be in any way responsible for any action taken based on such statements and undertakes no obligation to publicly update these forward-looking statements to reflect subsequent events or circumstances.

Business

40th Garment Technology Expo 2026 Inaugurated in Bengaluru, Setting the Stage for Smarter, Automated and Future-Ready Garment Manufacturing

Bengaluru (Karnataka) [India], September 19: The future of garment manufacturing took centre stage in Bengaluru today as the 40th edition of Garment Technology Expo (GTE) 2026 organised by GTE and India Exposition Mart Ltd., was inaugurated at Gayatri Vihar Palace Ground. Bringing together more than 120 exhibitors across 70,000 sq. ft. of exhibition space, the three-day technology showcase is […]

Read More
Business Fundraising Plan Kellton Tech Kellton Tech Board Meeting Kellton Tech Fundraising Kellton Technologies

Kellton Tech Board to Weigh Fundraising Plan on September 23

New Delhi [India], September 19: Kellton Tech Solutions Limited has informed stock exchanges that its Board of Directors will meet on Wednesday, September 23, 2026, to consider a proposal for raising funds through the issuance of equity shares and/or other eligible securities. The company disclosed this in an intimation filed with BSE (scrip code 519602) […]

Read More
Business CDSL IPF

CDSL IPF, Yuva Unstoppable and Amar Chitra Katha Bring Storytelling-driven Financial Literacy to Empower Nearly 21,000 Students

Mumbai (Maharashtra) [India], September 18: The CDSL Investor Protection Fund (IPF) has started distributing its investor education comic series to nearly 21,000 students across 60 schools in collaboration with Yuva Unstoppable. Developed with Amar Chitra Katha, the illustrated comics explain concepts related to saving, investing and responsible financial behaviour in an age-appropriate format, a statement […]

Read More